INDEX
- Deadline
-
-
DBooth Regulations
-
D1 Booth Standards
- important 1. Booth Standards
- important 2. Base Panel Outline
- important 3. Important Points for Booth Design
- 4. Exhibits Exceeding the Height Limit September 05 Applicable
- 5. Ceiling Structure September 12 Applicable
- 6. Two-Story Booth Structures September 12 Applicable
- 7. Suspended Structure September 12 Applicable
- 8. Universal Design
-
D2 Booth Display Regulations
- important 1. Display Contractor Registration August 29 Required
- 2. Product Liability (PL) Law
- 3. Floor Construction Work September 12 Applicable
- 4. Fireproofing Regulations / Advertising Balloons
- important 5. Electrical Power Supply September 12 Required
- 6. Green Power Certification System September 30 Applicable
-
D3 Product Exhibit Regulations / In-Booth Demo Regulations
-
D4 Booth Management Regulations
- 1. Hazardous Item Handling September 12 Applicable
- 2. Guidelines for Giving Premiums, etc., to Visitors
- 3. Others
-