CEATEC Exhibition Manual Site

日本語

INDEX

  • Deadline
  1. DBooth Regulations

    D1 Booth Standards

    1. important 1. Booth Standards
    2. important 2. Base Panel Outline
    3. important 3. Important Points for Booth Design
    4. 4. Exhibits Exceeding the Height Limit September 05 Applicable
    5. 5. Ceiling Structure September 12 Applicable
    6. 6. Two-Story Booth Structures September 12 Applicable
    7. 7. Suspended Structure September 12 Applicable
    8. 8. Universal Design

    D2 Booth Display Regulations

    1. important 1. Display Contractor Registration August 29 Required
    2. 2. Product Liability (PL) Law
    3. 3. Floor Construction Work September 12 Applicable
    4. 4. Fireproofing Regulations / Advertising Balloons
    5. important 5. Electrical Power Supply September 12 Required
    6. 6. Green Power Certification System September 30 Applicable

    D3 Product Exhibit Regulations / In-Booth Demo Regulations

    1. important 1. Prohibition
    2. 2. Lighting on the Ceiling
    3. 3. Sound Emissions and Copyrights
    4. 4. (Caution)Preventing wireless LAN problems
    5. 5. UHF-band Product Exhibits / Demonstrations September 12 Applicable

    D4 Booth Management Regulations

    1. 1. Hazardous Item Handling September 12 Applicable
    2. 2. Guidelines for Giving Premiums, etc., to Visitors
    3. 3. Others
Copyright CEATEC Organizing Committee All rights reserved.