CEATEC Exhibition Manual Site

日本語

INDEX

  • Deadline
  1. DBooth Regulations

    D2 Booth Display Regulations

    1. important 1. Display Contractor Registration Required 8月29日
    2. 2. Product Liability (PL) Law
    3. 3. Floor Construction Work Applicable 9月12日
    4. 4. Fireproofing Regulations / Advertising Balloons
    5. important 5. Electrical Power Supply Required 9月12日
    6. 6. Green Power Certification System Applicable 9月30日
Copyright CEATEC Organizing Committee All rights reserved.