E3
Infrastructure Services 5. Water Supply, Drainage, Compressed Air and Gas
- Application No.24
- DeadlineSeptember 05
Primary line construction is performed to supply water, water drainage and compressed air to booths. Construction inside booths is Secondary Construction and is performed for a fee to be paid by the exhibitor.
Water Supply and Drainage
- Supply pipe diameters: 13mmφ, 20mmφ
- Drainage pipe diameters: 40mmφ
- Water pressure: 0.18 Mpa–0.2 Mpa
*Contact the Management Office if other specifications are required.
Construction on 1 location | ¥88,000 *Pipe-laying inside booths and connecting machines are extra. |
Maintenance during the show | ¥5,500 |
Water consumption fee | ¥1,100 / m3 |
Compressed Air
If compressed air is required, please provide your own compressor.Additionally, we offer rental compressors through the following company: Three S Equipment Industry Co., Ltd. Please contact them for more information.
※The power supply and wiring costs for the compressor are the responsibility of the exhibitor.
Gas
Please contact the following company for more information:
Three S Equipment Industry Co., Ltd. Contact: Okumura/Sekimoto
114-0023 Tokyo, Kita Ward, Takinozawa 2-15-4
TEL: +81-3-5907-2100 e-mail:info@sss-setubi.jp
TEL: +81-3-5907-2100 e-mail:info@sss-setubi.jp
-
CExhibition Venue Regulations
-
C1 Exhibition Site
-
C2 On-site Management
- Important 1. Work Schedule
- Important 2. Exhibitor Badges, Worker Ribbons
- 3. On-site Photography
-
C3 Load-In & Load-Out
- Important 1. Vehicle Stickers
- Important 2. Load-In
- 3. Vehicles during the show
- Important 4. Load-Out
-
C4 Waste Disposal